Murdock Street is a narrow neighborhood street with little to no shoulder space along most of the roadway. Steep drainage ditches line the road in some spots, making walking space very limited. The City of Tigard desires to create a safe route along Murdock Street for both pedestrians and cyclists.   

Construction Update - 7/2/2025

In May, SLE, Inc. began work on the Murdock Street Project and SRTS: Templeton-Twality Improvements to improve road safety for all users with new sidewalks and pedestrian crossings.

What you can expect:

  • Work hours will be Mon. - Fri., 7:00 a.m. to 5:00 p.m. Occasional Saturday work is possible.
  • Construction noise during work hours.
  • Construction vehicles/equipment accessing the work area
  • Pride Disposal will begin their routes on Murdock Street at 5 a.m. This change will remain in effect for the duration of the project.

Detour Route: 

A detour route has been established to assist with moving traffic through the work area. The detour is expected to remain through October 2025. Click here to review the detour route. 

Revised Schedule:

  • Construction: June 2025 through Fall 2025
    *Construction near the middle and elementary schools (below 100th Ave) will start once the school year has ended to limit impacts on students getting to school. 


What's New?

  • Recently added updated project map.
  • Check out the story map.
  • Our project team will be reaching out to affected property owners to talk about the modified pathway and tree report

What is Planned?

  • New 8-10' wide shared use path
  • American with Disabilities Act (ADA) compliant ramps and other features
  • Safer pedestrian crossings
  • Improved access to and from Twality Middle School, Templeton Elementary School and East Butte Heritage Park
  • New stormwater improvements

Project Drawings

These drawings with cross sections show specific project details.

 twality-templeton map

Frequently Asked Questions 

Read the summary of the September 8, 2022 Open House. Do you have questions about the project?  Drop them in the form below and we'll get some answers. 

Please resolve the captcha.

Loading...

News Feed