Project Need: The bridge structure has deteriorated and needs to be replaced. There is a lack of bike lanes on the bridge and a wooden walkway on only one side.

Project Description: This project will replace the existing bridge with a new bridge wide enough to accommodate pedestrians and cyclists (on both sides) along with vehicles. Environmental regulations will require a new bridge to be significantly higher and longer than the current bridge.

Project Funding: The project was selected as part of the Local Bridge Program and includes $3,514,679 of federal funds. The project will be delivered by the Oregon Department of Transportation.

Operations and Maintenance Impact: Increased pavement area and striping maintenance, reduced bridge maintenance.

Contact: Zachary Morris | Principal Engineer | 503-718-2467zacharym@tigard-or.gov