Hall Blvd. is under construction, the construction started on September 21, 2009. The storm system is 90%
in place. The anticipated date to finish building the retaining wall is November 20, 2009.
The curbs are 75% in place.
On December 14, 2009; the retaining wall, the storm system, the concrete sidewalk and the curbs will be in
place. The project will be closed down during the winter leaving the pavement and the striping till Spring 2010.
|