City Logo Welcome to the City of Tigard
Defining Tigard: Tree City USA
-
- -
-
-
City Hall   Business   Community   Police   Library   Help  
21 Nov 2009  
- -
-
Related Items
- 
Current Bid Advertisements
-
- 
Previous Bid Advertisements
-

Quick Links
-  Home
-
-  Affordable Housing
-
-  Bid Advertisements
-
-  Budget Docs 09/10
-
-  City Charter
-
-  City Council Meetings
-
-  Construction in Tigard
-
-  Development Code
-
-  Emergency Management
-
-  Events & Meetings
-
-  Forms
-
-  Job Opportunities
-
-  New to Tigard?
-
-  Parks in Tigard
-
-  Passports
-
-  Public Records
-
-  Room Reservations
-
-  Tigard Municipal Code
-
- 
Volunteer Opportunities
-
- 
Water Division
-
- 
Zoning
-
 
Online Services
-  Library Catalog-WCCLS
-
-  Online Park Reservations
-
-  Tigard Maps
-
-  Utility Payments
-
 
-
blank image
Construction in Tigard

Durham Road Pedestrian Crosswalk

A much needed crosswalk lighting system, including in-road pavement lights and advance warning beacons, is being installed on Durham Road at 88th Avenue across from Tigard High School. Durham Road is a very busy arterial with traffic volume at over 20,000 vehicles per day. There are rarely traffic gaps large enough for pedestrians to safely cross the road. A traffic study showed that a large number of pedestrians (many of them Tigard High students) jaywalk across Durham Road in the vicinity of 88th Avenue.

Pavement lights and beacons are highly visible during the day and night. Because the lighting system is activated by pedestrians and not operated on a timed schedule, it should provide ample warning to alert drivers to the presence of pedestrians in the crosswalk. This will greatly enhance safer crossings.

When driving this stretch of road, be aware of this new traffic change — and please give construction workers, as they finish up this project, a "brake." Soon, Tigard High students, and other pedestrians, will have a much safer way to cross a very busy road.

Project Status

The work began on May 27, 2009 with removal of existing pavement and placement of new concrete pavement to prepare for the in-road lights. The lights will be activated on June 22, 2009.

Contacts
Contractor: D & D Concrete & Utilities, Inc
Daytime on the job emergency #: 503-638-7227
Don Nienke, President


City Contacts: Vannie T. Nguyen, P.E.,
CIP Engineering Manager
503-639-4171
vannie@tigard-or.gov

Zen Dutson
Engineering Construction Inspector
503-718-2472
zen@tigard-or.gov

-



CONTACT US
City of Tigard, 13125 SW Hall Blvd, Tigard, OR 97223, 503-639-4171 | Map and Directions

NORMAL CITY HALL BUSINESS HOURS
Monday—Friday 8 a.m. to 5 p.m.

AFTER-HOURS CONTACT
Public Works/Water: 503-639-1554 | Police Non-Emergency: 503-629-0111

Questions, comments, suggestions? Fill out the feedback form.

blank image