Project Description - Burnham Street
The construction of Burnham Street improvements incorporates
design concepts recommend by the Tigard Downtown Comprehensive
Streetscape Plan. These concepts include
widening Burnham Street
between Main Street and Hall Blvd. Burnham sidewalks, landscaped
medians, pedestrian crossing, and on-street parking will be provided
as part of the widening. In addition, a traditional four way
intersection will be constructed the intersection of Burnham Street and
Ash Avenue. Green street storm water management concepts will be
applied for water quality enhancement.
Project Description - Ash Avenue
This project includes construction of a 24-foot wide paved section
to provide two travel lanes and a 5-foot wide sidewalk on the west
side. Streetlights, storm drain and sanitary sewer pipes are also
included in the project. The new street connects Burnham Street/Ash
Avenue intersection to the new Park and Ride parking lot
constructed by the Commuter Rail project.
|
|
Contacts
|
| Contractor: |
Kodiak Pacific Construction
Aaron Jones
PO Box 886
Tualatin, OR 97062
Phone: 503-783-4300
Fax: 503-682-3777
|
| Owner's Representative: |
Al Girard
WH Pacific
Phone: 503-372-3632
|
| City Contact: |
Kim McMillan, P.E.
Engineering Manager
Phone: 503-718-2642; FAX: 503-624-0752
Cell Phone: 503-866-5784; 24/7 Hotline Number: 503-849-9065