Burnham Street Project
The Burnham Street Improvements include the following features:
- A 2-lane street between Main Street and Ash Avenue with water quality treatment planters, 18-foot
wide sidewalks, parallel parking on both sides of the street, landscaping, new street lights, and pedestrian crossings.
- A 3-lane street from Ash Avenue to Hall Blvd with 12-foot wide sidewalks, parallel parking on both
sides, median where feasible, landscaping, new street lights, pedestrian crossing, and gateway treatments
at the northwest and southwest corners of its intersection with Hall Blvd.
A roundabout was originally proposed for the Burnham Street/Ash Avenue intersection. However, based on public
input from the surrounding properties and the cost of land acquisition, the roundabout has now been replaced
with a 4-way intersection, which requires less property and resolves access issues at the intersection.