City Logo Welcome to the City of Tigard
Defining Tigard: Tigard Public Library
-
- -
-
-
City Hall   Business   Community   Police   Library   Help  
2 Sep 2010  
- -
-
Related Items
- 
Construction in Tigard
-

Quick Links
-  Home
-
-  Affordable Housing
-
-  Bid Advertisements
-
-  Budget Docs
-
-  City Council
-
-  Construction in Tigard
-
-  Departments
-
-  Development Code
-
-  Emergency Mgmt/Resources
-
-  Events & Meetings
-
-  Forms
-
-  Job Opportunities
-
-  New to Tigard?
-
-  Parks in Tigard
-
-  Passports
-
-  Public Records
-
-  Tigard Municipal Code
-
- 
Volunteer Opportunities
-
- 
Water Division
-
- 
Zoning
-
 
Online Services
-  Code Compliance
-
-  Library Catalog-WCCLS
-
-  Park Reservations
-
-  Ticket Payments
-
-  Tigard Maps
-
-  Utility Payments
-
 
-
blank image
Current Bid Advertisements

This page contains advertisements for some, but not all of the current City of Tigard solicitations.  If you have any questions, you may contact the responsible department for full information regarding City of Tigard Requests for Bids or Request for Proposals.

Solicitation and Bid Documents files are in Adobe PDF format. You will need the FREE Adobe Acrobat Reader to view these files.



There are no Current Bid Advertisements at this time.



Solicitations Yet to Be Awarded Number Due Date Documents
Invitation to Bids
Greenfield Drive & 130th Place Storm Drain Repair

A pre-bid walkthrough and meeting will be held at 10:00 am local time, Tuesday, August 17, 2010 at the project site located at the intersection between SW Ridge Field Lane and SW Greenfield Drive.

N/A
8/26/10 @ 2 PM
Bid Holders List
ITB Packet
Prevailing Wage Apprentice Rates (July 10)
Link to video
Pipe Snap Shots
Prevailing Wage Manual (July 10 Index)
Fax Back

Advertisement for Bids
Lower Cherry Drive Sewer Extension

N/A
8/24/10 @ 2 PM
Bid Results
Bid Tabs
Bid Holders List
Addendum #1
Sign In Sheet
Contract Docs
Plans
Erosion Control Permit
Fax Back


Invitation to Bid
Fanno Creek House Remodel Project

N/A
8/11/10 @ 2 PM
Bid Opening Results
Bid Holders List
Addendum #1
Pre Bid Attendees
Volume 1 - Bidding Requirements
Volume 2 - Project Manual
Drawings (zip file)
Project Photos
Fax Back


Invitation to Bid
Tigard Permit Center Re-Roof Project

Work under this ITB's resulting contract will be funded, in part or in its entirety, with federal funds from the American Recovery and Reinvestment Act through the Department of Energy.
N/A
8/5/10 @ 2 PM
Intent to Award
Bid Results
Bid Tabs
Pre Bid Attendees
Davis Bacon Locked In Rates
Addendum #1
Volume 1 - Bidding Requirements
Volume 2 - Project Manual
July 1st BOLI Manual for State and Davis-Bacon covered projects
Fax Back


Invitation to Bid
PMP - Pavement Overlay

N/A
Revised Due Date: 7/29/10 @ 2 PM
Bid Tabs
Bid Opening
Bid Holders List
Addendum #1
Packet
Fax Back

Request for Information (RFI)
Computerized Maintenance Management System (CMMS)

N/A
7/23/10 @ 3 PM
Packet
Attachment A
Attachment A
Invitation to Bid
Pavement Management Program - Slurry Seal

CIP 2010-00001
Revised Due Date: 7/14/10 @ 2 PM
Bid Results
Bid Tabs
Addendum #1
Bid Holders List
Contract Docs
Fax Back Form

Request for Bids
Garrett Street Overlay Improvements

N/A
6/24/10
2 PM
Notice of Intent to Award
Bid Results
Bid Tabs

Addendum #3
Addendum #2
Fax Back Form
Addendum #1
Bid Holders List
Packet
Drawings



Solicitations Awarded Number Due Date Documents
Request for Proposals:
10.0 MG Reservoir Improvements and Transfer Pump Station
  • A mandatory Pre-bid Conference was held at 10 a.m. local time, on Monday, November 30, 2009, at 12475 SW Bull Mountain Road, Tigard, OR 97224.
  •  
  • Work under this ITB's resulting contract will be funded, in part or in its entirety, with federal funds from the American Recovery and Reinvestment Act through the Safe Drinking Water Revolving Loan Fund.
  •  
  • Reproduction of plans and specifications from electronic media is downloaded at user's risk. City assumes no risk or liability for scale or completeness of information downloaded.
N/A
12/17/09
2 PM
Notice of Contract Award

Notice of Intent to Award

Bid Tabs

Bid Results


Addendum #6 - Construction Services


Addendum #5 - Construction Services

Plan Holders List


Addendum #4 - Prequalified List for Shoring & Pump Installer Contractors


Addendum #3
  Davis Bacon Locked In
  OR Prevailing Wage Manual
  OR Manual Amendments

10.0 MG Reservoir Photos

Addendum #2

Mandatory Pre-Bid Meeting Attendees


Addendum #1
  Prevailing Wage Manual for both State PWR and Federal Davis Bacon Act
  Vol 2 - Supplemental Information

Fax Back Form

Volume 1 — General Terms, Instructions and Contract Template 4.78 MB

Volume 2 — Technical Specifications 5.83 MB

Volume 3 — Drawings 16.84 MB



-





CONTACT US
City of Tigard, 13125 SW Hall Blvd, Tigard, OR 97223, 503-639-4171 | Map and Directions

AFTER-HOURS CONTACT
Public Works/Water: 503-639-1554 | Police Non-Emergency: 503-629-0111

Questions, comments, suggestions? Fill out the feedback form.





blank image